Design, construction, and commissioning of processing lines
Design, construction, and commissioning of processing lines | |||
Project initiation date | 22 December 2018 | Project complication date | 10 march 2021 |
Credit source | Isfahan Municipal Waste Management Organization + Municipal Assistance | ||
Partner companies in project implementation | The design, supervision, and management of the project contract performed by the organization. | Some micro contractors have collaborated on the project. | |
Brief description of the project | |||
To increase the productivity and the proper performance of processing lines and due to the problems caused by the depreciation and wear of existing line, construction of 4 new processing lines following the required capacity, optimal efficiency, and equipment put in the RDF agenda. According to downstream technologies such as anaerobic digestion and pyrolysis, the line’s design was predicted in a way to respond to the future needs of the technology. In the development plan of processing lines for the daily processing of 1000 tons of waste in Isfahan, 4 processing lines were predicted which are active with a capacity of at least 250 tons per day. After the reception hall, respectively consists of slate equipment, bag opener, first rotating sieve, second rotating sieve, ballistic sieve, magnet, manual separation lines, as well as conveyors for transporting organic and inorganic materials. The project advantages included:
|