Construction of the first module of waste pyrolysis unit in processing lines

Construction of the first module of waste pyrolysis unit in processing lines 
Project initiation date   22 December 2019 Project complication date   23 October 2021
Credit source Isfahan Municipality Waste Management Organization and Private Sector Participation and Investment
Partner companies in project implementation Bamdad Capital Financing Company Arse Pars Industry Development Engineering
The project output Production hydrocarbons with export capability

Coke production and evaluation of its quality and usable items of this product

Obtaining an export license for manufactured products
Obtaining an environmental assessment permit Calculating the quality and quantity of products produced for the first time in the country
Brief description of the project

The municipal solid waste consists of two main parts. The first part is the organic matter or food residues and the second part is inorganic materials that include plastics and petroleum. After separating two parts in the waste processing plant, the inorganic part, which usually consists of nylon and plastic materials and textiles, can be converted into other valuable products using up-to-date methods such as pyrolysis. In the pyrolysis process, carbonaceous materials decomposed in the presence of heat and lack of oxygen (indirect heat) and turned into pyrolysis oil, gas, and coke. In pyrolysis depend on process speed and temperature, it is possible to form materials in all three phases of liquid, solid, and gas. The solid material of the process is coke. The produced steam is transferred to the refining unit after condensation under the name of pyrolysis oil. After refining in the separation unit (distillation tower), they are converted into light, heavy and medium cuts (depending on the need) in the range of specifications close to diesel and gasoline.

Production of diesel from waste by pyrolysis method considered as a correct method to manage inorganic waste sector is in line with the goals of sustainable development. This reducing the production of solid fuels derived from waste, in addition to reducing the environmental problems caused by waste disposal and energy production. On the other hand, the investment cost of this project is much lower than waste incineration plant, and due to the modularity of pyrolysis reactors in capacities of 10 to 20 tons, it is possible to develop and improve it step by step. In the first phase, considering that the implementation of the waste pyrolysis project of waste processing lines in the country has not been implemented yet, a unit with a capacity of 10 tons per day will be implemented with the aim of answering the questions of the General Department of Environment and obtaining environmental permits, as well as formulating the executive procedure for exporting the product.

Back to top button