Construction of an incinerator in the South Azadegan oil field

Construction of an incinerator in the South Azadegan oil field
Project initiation date   2018 Project complication date   2020
Credit source Petroleum Engineering and Development Company
Partner companies in project implementation Petroleum Engineering and Development
The project output Dangerous waste disposal Normal waste disposal
Brief description of the project
Azadegan South oil field is located 120 km west of Ahvaz on the border with Iraq. The development of this field has been done in two phases to produce 600,000 barrels of oil per day. The first phase aims to produce 320,000 barrels of oil per day, within 52 months of the contract becoming effective and the second phase was carried out within 35 months after the completion of the first phase, to increase production to a ceiling of 600,000 barrels of oil per day. Given that waste, production is an integral part of the oil fields’ construction and operation, for the main management of production waste, a waste incinerator was construct

ed to eliminate waste in this area. The project includes the construction of main roads, access roads, accommodation camp and office complex, and waste incinerator. This incinerator is used for the disposal of normal and hazardous waste with a capacity of 9 tons per day. The project is currently in operation.

Back to top button